Challenges and Objectives

The client required a comprehensive analysis to understand how the structure would perform under different loading conditions. The primary objective was to find out maximum permissible equipment weight that the assembly could withstand the without failure.

Methodology (Solutions Implemented)

1.Modeling: Utilized 3D CAD File to create a Simplified Geometry for FEA.
2.Boundary Conditions: Applied loads on the top and vertical panels in combination with the Self weight of the structure.
3.Load Cases: Analyzed various load cases to simulate real-world scenarios.
4.Post-Processing: Evaluated stress and deformation to observe the behavior of the structure under different loading conditions.

Benefits (Results Achieved)

1.Identified areas of potential stress concentration and deformation.
2.Provided insights for structural modifications or reinforcements if necessary.

Summary of Project

The FEA analysis of the Underground Facility Management Building’s provided valuable insights into its structural behavior, ensuring that it meets safety requirements and can withstand expected loads. The analysis helped in optimizing the design for better performance and durability.

Ready to Transform Your Project?
Talk to Our Experts

Having explored our detailed case studies, that show the real-world impact of our solutions and get inspired on how we can help elevate your project to the next level.